Our past month has been very busy with bottom work. A few photos;
On Thursday 1 September we splashed. Once again a very professional service by Jim the Hard Manager
Our past month has been very busy with bottom work. A few photos;
On Thursday 1 September we splashed. Once again a very professional service by Jim the Hard Manager
We’ve been on the Hard for 3 weeks.
Generally it’s been hot and humid, often raining at night with thunder and lightning. Today is unusual with heavy downpours, grey skies, lots of wind and the obligatory thunder and lightning.
So we’re inside catching up on household chores and resting.
A few work photos;
Me, with my mask and goggles, to protect me from the paint particles as I’m sanding the hull, and the paint has copper in it, which is not healthy for your lungs. It’s tiring work, and I can only get one side of one hull done in a day
This week we’re into the final stretch with a short jobbing list of items to complete, and then we can start with Epoxy Primer on the new waterline area, fiber-glassed areas and any other spots needing Primer.
After that it’s Anti-Fouling.
Other than that, we waiting for a Grounding Plate we ordered from USA, one of ours ‘blew off’ when the lighting strike wave hit us, a month ago.
Of interest, we watched the Ocean Innovations Sea Pod being launched.
This is the Base which gets anchored to the Sea Bed, and floats
This is the Sea Pod. This one is an apartment consisting of a Living Room, Kitchen, Bedroom and Bathroom.
The Pod being placed onto the Base
The Pod floating on its base. The Pod will also have Solar Panels, a Water Maker, and a Jacuzzi.
Ocean Innovations hope to sell these as Homes. I don’t really see that happening, but would make a fabulous Eco Friendly Vacation Accommodation.
A week has passed and we’ve been busy.
Plus, it’s Hot, Humid and Rains most of the Time.
And the Mossies are Rife. Huge and Blood Thirsty.
Most urgently and importantly I made new Hatch Screen cover for the front four hatches, and Unrolled the big one I have over the Cockpit sliding doors. I also installed the Mossie Net over our bed.
Otherwise, it’s been normal bottom work
Our table and rest setup under Meshugga
We left Shelter Bay Marina and did a tour of the Colon Bay, looking to see if there were any other anchorages, as we might be returning here next year.
Cargo ships in the Bay
We arrived back at Linton Bay, and Jenny made arrangements to leave us, after being aboard Meshugga for 7 + 1/2 months.
We made arrangements to Haul Out, and on a windy Saturday morning 30 July, we Hauled with Jim and his team for a Very Professional Haul
Jim, the Hard Manager, and Crane Driver, Nicholas and the Diver who checked the straps were all the in the correct position
We sailed 80 miles from East Lemon to Colon, overnighting in a bay at Puerto Linton. Most of the way we had nice winds, sometimes a little light, but we kept moving well and only started the motors when we approached the Very Busy entrance to Colon (which is also the entrance to the Panama Canal).
These are all the ships at anchor waiting their slot for transiting the Canal. Jenny visually counted 45 ships at anchor at sea.
I was very exited, and having booked on-line entry tickets, I arrived at my first location, the Midhope Castle, a short 15 minute drive from...