Wednesday, 23 June 2021

Bahamas - Ragged Island, Hog Cay, FlyBridge Awning is Complete

It’s finally time, and the FlyBridge is finished ! YAY !

Below is a collage of photos of the manufacture and hoisting of the FlyBridge onto Meshugga.


Frame ashore and 1st wood panels


More wood





Wood complete and trimmed with access holes/windows


 
Glue perimeter piping


Getting the perimeter curve fair


Bonds underside for glassing


Bonds to edge and glass pipe


Perimeter pipe glass complete


Deidre Assisting


Window edge mold with glass layup



Cutting windows and installing edging



Ready for glass


First Top Layer



Second Top Layer complete



Frame to support when flipped


Support base


Underside - window trim




Underside Gelcoat


Installing tie-down loops from the top



Tie-down Loops (pipe for size)


Finishing window trim


Solar Panel Supports


GelCoat



Lifting Ropes


Onto Hobie


Fenders for perimeter floatation


Nicholas walked the FlyBridge floating on the Hobie and Fenders to an area of the beach where there were no rocks and we could bring Meshugga in close to the beach


Flybridge tied off overnight in front of the Yacht Club


Whilst the FlyBridge was floating, Nicholas disassembled the Frame, and took it back to Meshugga



Aboard Meshugga, he re-assembled the frame and pop-riveted the frame back together with 316 stainless steel rivets.


Start of the hoist


Liberating Fenders


Nearly there



Moving to Center


Final Adjustments


Lashing down



Complete (except for windows, solar panels and electrics)


Looking good




Thanks to Larry on Restless for the Drone photos and Hi-Res photos taken from the Yacht Club during our hoist.